Hey there, if you’ve ever picked a transformer bushing for your grid setup, you know that insulation resistance isn’t just a box to check—it’s the first line of defense against costly outages. As someone who’s been deep in the bushing game for years (we make these things, so trust the process), I’ve lost count of how many times a client’s pre-test went sideways because they skipped or messed up this step. Today, let’s break down how to actually measure insulation resistance for a transformer bushing—no fancy jargon, just real, actionable steps that work, plus a few insider tricks from our shop. Transformer Bushing

First, let’s nail down what insulation resistance (IR) even means here, because it’s not the same as testing a regular wire. A transformer bushing is that ceramic or composite cylinder that lets the high-voltage conductor poke through the transformer tank, right? Its whole job is to keep that hot conductor from arcing to the grounded tank or the outside world. Insulation resistance is basically how well that material blocks tiny electrical leaks. If IR’s too low, that means there’s moisture, dirt, or a crack in the insulation—and that’s a ticking time bomb for your transformer. We see this all the time when clients bring back faulty bushings: low IR is the #1 complaint, way more than anything else. So testing this right is non-negotiable.
Before you grab your test gear, stop and prep. Skipping prep is how people mess up, fast. Let’s start with safety—yes, even if the transformer’s de-energized, that doesn’t mean it’s dead. There’s residual charge stored in the bushing, and a good zap from that will ruin your day. First, lock out and tag out the transformer (LOTO, if you know the shorthand) so no one accidentally energizes it. Then, discharge the bushing properly: use a grounded discharge rod, touch it to the bottom conductor and the grounded tank/outer part, hold for 2-3 minutes, not just a quick tap. I’ve seen guys skip this and jump back when a spark hits—don’t be that person.
Next, gather your gear. You don’t need a million tools, just the essentials. First, a megohmmeter (aka “megger”)—make sure it’s rated for the voltage of your bushing. Bushing voltages range from medium (like 15kV) all the way up to extra high (500kV+), so a 1kV megger won’t cut it for a 230kV bushing—you’ll get a false low reading every time. Then, leads: use thick, short leads, not those flimsy long ones you use for other tests. Long leads add leakage current that skews results, especially for low IR readings. Last, safety gear: insulated gloves (class 00 or higher, matching your voltage), safety glasses, and a mat to stand on so you’re not grounded directly. Pro tip from our team: label each lead clearly—one goes to the bushing’s conductor, one to the ground flange, and the third (if your megger has it) to the outer semi-conductive layer on composite bushings, if it has one. Oh, and double-check that your megger is calibrated within the last year—we test every megger we send out with our bushings, and a miscalibrated tool is just a waste of time.
Now, let’s get to the actual testing step. This is where a lot of people mess up the procedure, so follow this exactly. First, disconnect the bushing from the transformer’s top terminal and any external wiring—you don’t want stray loads messing with the current. Then, clean the bushing’s surface around the top and bottom terminals: a dry microfiber cloth, not a wet one, to get rid of dust and grime that would add surface leakage. If the bushing is really dirty, you can use a little isopropyl alcohol (90%+), let it dry fully—moisture here will throw off your numbers, big time.
Now, connect the megger leads. Let’s get this straight: the positive (red) lead goes to the high-voltage conductor of the bushing (that’s the center wire inside). The negative (black) lead connects to the grounded flange at the bottom of the bushing (that’s the part that bolts to the transformer tank). If your bushing is composite, some have an outer semi-conductive shield layer—if yours does, you can connect the third lead (guard, or G lead) to that shield. Why? Because it blocks surface leakage on the bushing’s outer surface from messing with the reading. For porcelain bushings, you don’t need a guard lead, since the surface leakage is lower.
Once leads are hooked up, crank the megger. Wait, how long? Most people only test for 1 minute, but here’s the thing: IR is time-dependent. The dielectric absorption ratio (DAR) is the ratio of the 1-minute reading to the 15-second reading, and the polarization index (PI) is 10 minutes divided by 1 minute. Both are super important for bushings, not just the raw 1-minute number. If you only do 1 minute, you might miss a moisture issue that only shows up after a few minutes. So run the megger for at least 10 minutes, note the readings at 15s, 1min, and 10min. For high-voltage bushings, you can also run a 5kV test instead of the standard 2.5kV, just make sure the megger can handle that voltage.
Now, what numbers mean good vs. bad? This is where it’s not one-size-fits-all, which is why generic guidelines are useless. First, raw IR: for medium-voltage bushings (up to 36kV), a good reading is usually 1000 megohms (MΩ) or higher. For high-voltage (138kV to 230kV), it should be at least 5000 MΩ. For extra high (500kV+), shoot for 10,000 MΩ or more. But wait—temperature matters a ton. The insulation’s resistance drops as it gets hotter, so your reading will be lower in summer than winter. Always correct the reading to 20°C using the megger’s built-in temp calculator, or the standard correction factor (roughly a 10% drop per °C above 20°C, but better to use exact numbers from the bushing spec sheet).
Then the ratios: DAR (1min / 15s) should be above 1.3 for a healthy bushing, PI (10min / 1min) should be above 2. If those are lower, that’s a sign of moisture or contamination in the insulation—something you don’t want, especially for bushings that have been in service for a few years. I once had a client call us panicking because their new bushing had a 1min IR of 2000 MΩ, which sounded low for a 230kV unit. Turns out they tested it at 35°C, corrected it to 20°C, and it was over 6000 MΩ—perfectly fine. Don’t rely on uncorrected numbers, that’s the #1 mistake we see.
Wait, what about after the test? Don’t skip the discharge step here, even though you already discharged it earlier. After you’re done testing, turn off the megger, then immediately discharge the center conductor again with a grounded rod—this time, hold it for 5 minutes, because the megger pushes a high voltage into the insulation, and that stored charge is bigger than the residual transformer charge. We always include the discharge rod with every bushing we sell, specifically so our clients don’t forget this step.
Now, a few common mistakes that waste people’s time (and cost them money). First, testing the bushing while it’s still connected to the transformer. The transformer’s core and windings will mess with the IR reading, giving you a lower number than actual. Second, using too low a megger voltage. If your bushing is rated for 230kV, a 1kV megger won’t stress the insulation enough to pick up small leaks, leading to a false pass. Third, not correcting for temperature—like I said earlier, that’s the biggest source of wrong readings. Fourth, not cleaning the surface of the bushing before testing—dust and salt (if you’re in a coastal area) add surface leakage that makes your IR look lower than it is. We have a guide for surface cleaning that’s tailored to our bushings, so if you pick one up, ask us for that—we send it free with every unit.
If you’re testing a bushing that’s already in service (not a new one fresh out of our warehouse), there are a few extra checks. First, note the date of the last test—if IR has dropped more than 20% from the last reading, that’s a red flag. Also, check for external damage: cracks in porcelain, discoloration on composite, rust on the flange—all of these can lead to low IR over time. For in-service bushings, we recommend testing every 3-5 years, depending on the operating environment (more often if it’s in a dirty or humid area).
Now, let’s talk about when to worry. If your corrected IR is below the minimum for your voltage, or if your PI is under 1.5 or DAR under 1.1, that means the bushing is compromised. Don’t keep running it—we’ve seen a bushing with low IR arc through the tank and take out an entire transformer, costing tens of thousands in downtime and repairs. If you get a bad reading, pull the bushing and send it to us or another certified lab for more testing, or replace it if it’s old.
Wait, as a bushing supplier, I have to add this: the best way to avoid bad IR tests is to start with a quality bushing. A lot of guys buy cheap no-name bushings to save money, and the insulation material is thin or has tiny manufacturing flaws that show up as low IR during testing. All our bushings go through a 24-hour full IR and PD (partial discharge) test before they leave our facility, so you know what you’re getting when it arrives. We even include a test certificate for every unit, so you can reference our factory test results when you do your on-site test—way better than a random online number.
At the end of the day, measuring insulation resistance for a transformer bushing isn’t rocket science, but it does need attention to detail. Skip the discharge step, use the wrong megger, or forget to correct for temperature, and you’ll get a bad reading that makes you panic, or miss a real issue. If you’re still unsure about how to do the test, or if you need help interpreting your numbers, don’t hesitate to reach out. We’re not just a supplier—we’re here to help you get this right, because we know how much your transformer setup relies on good bushings.

If you have questions about testing our bushings, need a copy of our factory test guides, or want to chat about upgrading your transformer bushing setup, feel free to connect with us. We’re always here to help make sure your insulation tests go smoothly and your equipment runs safe.
Oil Level Indicator References
- IEEE Standard Guide for the Inspection, Testing, and Maintenance of Power Transformers,
- Transformer Bushing Testing Procedures, Electrical Construction Maintenance Magazine,
- Megger Insulation Resistance Testing Guidelines for High-Voltage Insulation.
Hebei Anmei Electrical Equipment Co., Ltd.
Hebei Anmei Electrical Equipment Co., Ltd. is one of the most professional transformer bushing manufacturers and suppliers in China, specialized in providing high quality products and service. Please feel free to buy customized transformer bushing made in China here from our factory. Contact us for quotation.
Address: Hejian Yingzhou Economic Development Zone, Cangzhou City, Hebei Province
E-mail: sales@anmeielec.com
WebSite: https://www.anmeibushing.com/